© 2018 Zhangjiagang Hengyu Machinery Co.,LTD All rights reserved. Designed by iwonder.cn Site Map
Email: info@hengyu-machinery.com
Density carbonated water beverage filling machine
We are specialized in manufacturing can filling machine from China.
Detailed parts
Filling parts
precise centralization,which ensure the right seating of mouth of the bottle and filling valve,with low liquid loss.
Capping parts
Adopt magnetic head, transfer torque through strong magnet, adjustable torque, meet the needs of various head.
Technical parameter
Company Information:
Companies to many years of research results and production experience as the basis, widely absorb and digest the advantages of the same industry at home and abroad, and one after another from Germany, Italy, the introduction of a full set of the latest beverage packaging machinery technology. To Provide high quality beverage equipment for domestic and international customers. The company has several series of independent research and development products, has obtained the national patent. As the senior beverage machine manufacturer, the working environment is elegant, has the per-fact modern office condition, has the specialized sales department, the research and development department, the technical department.
Packing & Delivery
Package
Type : As usual, we adopt wooden case as package type. It's suitable
for long-distance transport. According to customers' special demand, we
could adopt sheet iron case and so on.
Transport : By sea. By train. By aircraft.
Packing details: |
Wrapping machine by protected film. |
Fixed with the base of wooden. That is enough strength for long time transport. |
Customers can choose delivery by ship, by air or by truck. Will choose favorable shipping partner. |
Our services
1)The machines' quality that we sold will be guaranteed for 1 year.
2) We will give you long time technology supply.
3) We can dispatch our engineer to you for installing and debugging
machines. Engineer's roundtrip tickets, accommodation, and your side
travelling fee will be charged by you.
4)We can also supply you mounting process, so your engineers can fit and debug machines by themselves.
1. Installation & adjustment
After the equipment are arrived at the customer's site, the customer is
responsible for unpacking and arranging the equipment according to the
placement drawing; and does under our install-adjust technicians'
guidance. Costs of the staff are decided at last.
2. Training
1). We are responsible for offering the technical training to user. The
training content includes the structure and maintenance of the
equipment, control and operation of the equipment. Through training,
users' technical staff can grasp and the skill of operation and
maintenance proficiently, and deal with the general troubles in time. We
will appoint qualified technical staff for the guidance.
2). The buyer can send staff to our company for learning.
3. Quality assurance
1). We guarantee the goods offered are brand-new, not used, with latest
design and suitable material made, and we guarantee the specification
of the equipment is consonance with the contract.
2). We guarantee
the line achieve product technical performance indicators within 5 days
after feeding operation through the correct guidance of the installation
and commissioning.
3). We are responsible for the fault and damage
of the production line caused by our design, technology, manufacture,
installation, adjustment and material defect etc. that all belong to our
responsibility.
4). The warranty period is 12 months after
acceptance check of the production line. If there is any different
between the furnished equipment in the customer's factory and the
equipment concerned in the contract, the users have the right to pass
the inspection book to the legal department to claim for compensation to
our company within goods warranty period.
4. Warranty
Offer 12
months maintenance period to the problem that caused by our design,
manufacture and the material quality, and offer the relevant parts and
effective service for free for above reason. We will offer a widely and
favorable technical support, after service all the time after guarantee
period.
FAQ
Q1: How to choose the most suitable machine and get the final suitable price?
A1: For beverage bottle Filling Machine, you need to reply us the following questions:
1. What kind of product (carbonated or no carbonated beverage, juice or water) for filling?
2. What's the volume of the bottle(Can)?
3. Could you show us picture of your Bottle/can?
4. Could you send some bottle samples to us?
5. What capacity do you need for production?
Q2: Do you have videos or manual for us to know the machine better?
A2: Yes, of course. Please email us and ask for it. We will send you soon.
Q3: How about your machine's quality?
A3: Every machine is applied with CE certificate, SGS certificate,
highly meets requirement of TUV, made of SUS 304 for food packaging;
SUS316 for pharmaceutical products packaging. Inspect certificate is
available.
Q4: What's the delivery time?
A4: Depending on
your order: for whole production line it is 40~60 workdays. bottle or
tube filling machine, labeling machine, capping machine, unscrambling
machine, can sealing machine will be 30~40 days. Other simple equipment
will be around 20 days. The above delivery time is calculated after
receiving the down payment as well as sample bottles / tubes and
materials.
Q5: Is there MOQ for your machine?
A5: 1 set is acceptable. Of course, if you order more, it will be fine and its price will be more competitive.
Q6: How to install the machine?
A6: Please do not worry. We will send you detailed video and
instruction manual for your reference. Customer also can appoint your
engineers to our factory to learn. Our engineers also can go abroad to
install the machine well, however, customer needs to pay round air
tickets, hotel and service expenses.